top of page

Z = √(R2 + X2) < +/- 3%
Conductor Control
03 / Simulation & Real-time Testing
The Simulation - Schematics, layout in 3D view, time-domain setup, Eye-diagram to substrate testing in real-time simulations match and validation only via our fab process.
-
Accumulative Testing on all layers.
-
Impedance matching/geometry confirmation.
-
Simulation match
Maintain impedance control < +/- 3%



The Electrical Test :
-
Accumulative Testing on all layers.
-
Impedance matching/geometry confirmation.
-
Simulation match
Maintain impedance control < +/- 3%



AVIV Technology Pte. Ltd.
שָׁלוֹם
Shalom
Hello
你好
こんにちは
안녕하세요
Bonjour
Hallo
مرحبا
Company
" Technology is a force for peace and prosperity "
MLSHI®
Resources
Contact
bottom of page